Guide specifications (cont)
I. Thermal Insulation:
Evaporator surfaces shall be factory insulated. Insula-
tion of refrigerant pump, sump, piping, and chilled
water headers, in addition to any hot surfaces shall
be field supplied and installed on the machine.
Chiller manufacturer shall recommend the material
and specify surface area to be insulated.
J. Sound Level:
The overall sound pressure level of the chiller shall
not exceed 80 dbA when measured per ARI Stand-
ard 575 (latest edition).
K. Start-up:
1. Unit manufacturer shall provide a factory-trained
service representative, employed by the chiller
manufacturer, to perform and/or supervise
chiller pressure test (when required), charge
chiller with refrigerant (water) and lithium
bromide solution, place unit into operation, and
calibrate all controls in accordance with the
manufacturer’s written start-up, operating, and
maintenance instructions.
2. After unit start-up has been performed, the same
factory representative shall be available for a pe-
riod of instruction not to exceed 4 hours to
instruct the owner’s personnel in the proper start-
up, operating and maintenance procedures.
3. Manufacturer shall provide the following
literature:
a. Installation Instructions
b. Start-Up, Operating and Maintenance
Instructions
c. Field Wiring Diagrams
L. Options and Accessories:
1. High-Pressure Waterboxes:
Waterboxes rated for 300 psig (2068 kPa)
working pressure with removable covers shall be
furnished when specified on the equipment
schedule.
2. Hot Water Generator:
A generator designed, built and stamped in ac-
cordance with ASME Section VIII, Division 1 re-
quirements with a design working pressure of
250 psig (1724 kPa) shall be furnished for hot
water applications when specified on the equip-
ment schedule.
3. Special Tubing:
Tubing of non-standard materials shall be
provided when specified on the equipment
schedule.
4. CSA Certification:
Chiller shall be certified in accordance with CSA
requirements when specified on the equipment
schedule.
5. Shipping Configuration:
Chiller shall ship in either one or two pieces as
specified on the equipment schedule.
6. Flanged Nozzle Connections:
ANSI 150 psig (1034 kPa) R.F. (raised face)
flanges shall be furnished on all waterbox nozzle
connections when specified on the equipment
schedule.
7. Thermometer Set:
A package of 5 adjustable angle thermometers
shall be factory supplied for field installation
when specified on the equipment schedule.
Each shall have a 9-in. scale with a working
range of to 120 F (-18 to 49 C) and shall be
equipped with a
3
4
-in. NPT brass well.
8. Chilled and Condenser Water Flow Switches:
Chilled water and condenser water flow
switches, rated for either for 150 psig
(1034 kPa) or 300 psig (2068 kPa), shall be fac-
tory supplied for field installation when specified
on the equipment schedule.
9. Steam Valve (electric or pneumatic):
A steam valve shall be provided when specified
on the equipment schedule.
10. Unit Voltage:
Unit shall be capable of operating on 3 phase,
50/60 Hz, when specified on equipment
schedule.
11. Isolation Package:
A vibration isolation package consisting of sole-
plates and neoprene isolation pads shall be fur-
nished when specified on the equipment
schedule.
Carrier Corporation Syracuse, New York 13221 6-98
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2
Tab 5b
Page 28 Catalog No. 521-612 Printed in U.S.A. PC 211 Form 16JB-2PD
Replaces: New
Vue de la page 27
1 2 ... 23 24 25 26 27 28

Commentaires sur ces manuels

Pas de commentaire