Control sequence
To start: Local start-up(manual start-up)is initiatedby press-
ing the LOCAL menu softkey which is indicated on the de-
fault local interface device (LID) screen. All pre-start safeties
are checked to verify that all pre-start alerts and safeties are
within limits. If one is not, an indication of the fault will be
displayed and the start is aborted. The signal is sent to start
the chilled water pump. Five seconds later, the condenser
water pump is energized. Thirty seconds later, the controls
check to see if flow has been confirmed by the closure of
the chilled water and condenser water flow switches. If flow
is not confirmed, the controls continue to monitor flows for
a maximum of 5 minutes. If flow is confirmed, the controls
checkthe chilledwater temperatureagainst thecontrol point.
If the temperature is less than or equal to the chilled water
control point, the condenser water pump turns off and the
controls go into a recycle mode.
If the water/brine temperature is high enough, the start-
up sequence continues and starts the solution pump. Once
the pump starts, the controls look for and verify that the
solution pump pressure is greater than 10 psig (67 kPa). If
the pump pressure is not verified in 2 minutes, the start-up
procedure is terminated and a solution pump pressure fault
is displayed. After solution pump pressure is verified, the
controls go into the warm-up period.
The refrigerant pump is energized and the steam control
valve slowly opens to 50%. The initial steam control valve
position for warm-up can be adjusted. The controls moni-
torthe strongsolution temperaturefromthe generator.When
this temperature reaches 158 F (70 C) and there is a tem-
perature difference across the evaporator, the controls go
into ramp loading. If both conditions are not met in
20 minutes, the unit will shut down on a solution warm-up
fault.
Once started: The controls enter the ramp loading mode
to slowly open the steam control valve to prevent a rapid
increase in boiler demand. Once ramp loading is com-
pleted, the controls enter the capacity control mode. Any
failure that results in a safety shutdown immediately acti-
vates the dilution cycle, closes the steam control valve at its
maximum rate of travel, activates the alarm light and relay,
displays the fault that occurred, and updates the alarm his-
tory log.
Shutdown sequence: Chiller shutdown can occur if any
of the following events happen:
The Stop button is pressed for at least one second
A recycle shutdown is initiated
Time schedule has gone into Unoccupied mode
Machine protective limit has been reached and chiller is
in alarm
The start/stop status is overridden to stop from the CCN
network or the LID
Once thecontrols are placedin shutdown mode,the shut-
down sequence closes the steam control valve. The soft-
ware then initiates a 15-minute dilution cycle to lower the
concentration of the solution and equalize chiller tempera-
tures. Solution pump ontime and service ontime stops. The
condenser and chilled water pumps stop.
Restart: Restart is permitted after the dilutioncycleis com-
pleted and there is a need for chilled water. If the shutdown
was due to a safety shutdown, the reset button must be de-
pressed before restarting the chiller.