Guide specifications
Hermetic Absorption Liquid Chiller
Size Range: 108 to 680 Tons (380 to 2392 kW)
Carrier Model Number: 16JB
Part 1 General
1.01 SYSTEM DESCRIPTION
Microprocessor controlled, single-effect (one-stage)
absorption liquid chiller utilizing hermetic refrigerant
and solution pumps, lithium bromide solution as the
absorbent, and water as therefrigerant. Low pressure
steam or hot water shall be supplied to the generator
as the heat source.
1.02 QUALITY ASSURANCE
A. Chiller performance shall be rated in accordance with
ARI Standard 560 (latest edition).
B. Chillershall bemanufacturedin accordancewithANSI/
ASHRAE 15(latest edition) SafetyCode for Mechani-
cal Refrigeration.
C. The tube side ofthe absorber and evaporator sections
(when applicable) and the tube side of the generator
(for hot water applications) shall be designed, con-
structed and stamped in accordance with ASME Sec-
tion VIII, Division 1 requirements.
D. Each chiller shall undergo a series of standard factory
tests to ensure that the unit is leak tight, that all elec-
trical components operate as intended, and that ev-
ery aspect of unit fabrication meets stringent quality
standards in accordance with good practice and the
manufacturer’s quality assurance requirements.
1. The shell side of each chiller shall be leak tested
by pressurizing to 15 psig (103 kPa) with dry air
and then checked by spraying a soap and water
mixture on all welds, tube joints, and/or gasketed
jointsto identifyany major leaks.Afterward, amass
spectrometer test shall be performed by evacuat-
ing the unit to 0.10 mm Hg absolute, covering the
machine with a vinyl tent and introducing helium
gas under the tent. Any remaining leaks will allow
the helium to be drawn into the shell side of the
machine. The acceptable total leak rate as mea-
sured by the mass spectrometer test shall not
exceed .00002 cc/sec standard air.
2. The tube side of the evaporator, absorber, con-
denser, and (steam) generator shall be hydrostati-
cally tested at 1.5 times rated design pressure and
held for1 hour.For hot waterapplications, a pneu-
matic test shall be performed on the generator at
1.25 times rated design pressure.
3. All machine wiring shall undergo an insulation re-
sistance test. The machine control panel and all
electrical components shall also be functionally
tested to verify continuity and proper electrical
operation.
4. Final assembly inspection shall consist of verifying
that all valves, controls, instrumentation, pumps,
purge components, and all other machine com-
ponents have been properly installed on the
machine.
5. Each unit shall thenbe checked for overall appear-
ance and dimensional accuracy.
6. Final inspection shall be performed on each unit
to check that painting of the unit is as specified,
nameplate data is correct, and that all accessories
are furnished as required.
1.03 DELIVERY, STORAGE, AND HANDLING
A. Unit shall be stored and handled in accordance with
the manufacturer’s recommendations.
B. Unit shall not be factory-charged with lithium bro-
mide solution to prevent possible internal corrosion
damage from occurring should the inside of the ma-
chine be accidentally exposed to air during shipment
and/or installation. Charging of lithium bromide so-
lution shall be performed at the jobsite in accordance
with the manufacturer’s written instructions.
C. One-piece units shall be shipped under vacuum on
the shell side. Two-piece units shall be shipped with
5 psig (34 kPa) nitrogen pressure.
D. Chiller shall be shipped with nameplates indicating
name of manufacturer, model size, serial number, and
all other pertinent machine data.
E. Chiller shall include shippingrails as standard for ease
of sliding or moving a unit into position to simplify
installation. Neoprene isolation pads shall also be in-
cluded with the machine as standard.
1.04 WARRANTY
Manufacturer shall guarantee the chiller against de-
fects in materials or workmanship for a period of one
year from date of initial operation or 18 months from
date of shipment, whichever occurs first. Manufac-
turer shall provide the labor to repair or replace any
part found to be defective in material or workman-
ship within the warranty period.
Part2—Products
2.01 EQUIPMENT
A. General:
Absorption liquid chiller shall include evaporator,
absorber, condenser, generator, solution heat ex-
changer, refrigerant/solution pumps, purge system,
piping, wiring, controls and auxiliaries. Shipment of
the machine shall be in 1 or 2 pieces depending on
model size. Initial charge of lithium bromide shall be
included with the chiller for charging at the jobsite.
Generator shall be designed for operation on either
low pressure steam or hot water as specified on the
equipment schedule. A U-baffle shall be provided in
both the upper and lower shell to serve as a natural
insulating barrier between sections. The double sump
formed by the U-baffle in the bottom of the absorber-
evaporator section shall allow temporary storage of
refrigerant or solution, thereby reducing service time
and expense by alleviating the need to remove the
fluids from the machine during service and/or main-
tenance operations.