Carrier AQUASNAP 30RA Spécifications

Naviguer en ligne ou télécharger Spécifications pour Pompes à chaleur Carrier AQUASNAP 30RA. Carrier AQUASNAP 30RA Specifications Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 31
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Carrier is participating in the
Eurovent Certication Programme.
Products are as listed in the
Eurovent Directory of Certied
Products.
30RA 040-240 “B”
Air-Cooled Liquid Chillers
with Integrated Hydronic
Module
Nominal cooling capacity 39-245 kW
50 Hz
Installation, operation and maintenance instructions
AQUASNAP
For the operation of the control please refer to
the Pro-Dialog Control manual for the
30RA/RH - RY/RYH “B” series
Vue de la page 0
1 2 3 4 5 6 ... 30 31

Résumé du contenu

Page 1 - Air-Cooled Liquid Chillers

Carrier is participating in the Eurovent Certication Programme. Products are as listed in the Eurovent Directory of Certied Products.30RA 040-240 “B

Page 2

114 - PHYSICAL DATA30RA 040 050 060 070 080 090 100 120 140 160 200 240Nominal cooling capacity* kW 39.4 49.0 57.0 67.0 79.0 89.0

Page 3

12Compressor usage and electrical data COMPRESSOR 30RAReference code I Nom I Max LRA* Circuit 040 050 060 070 080 090 100 120 140

Page 4

13 - altitude: ≤ 2000 m - presence of hard solids, class 4S2 (no signicant dust present) - presence of corrosive and polluting substances

Page 5

141101001000100001 10 4030201234567891011124546-10˚C0 5 10 ˚C4444.58Evaporator water leaving temperature1 Evaporator ∆T = 5 K2 The evaporator and th

Page 6

1558955249936340244113217022239398.5PEBB1YX7 - ELECTRICAL CONNECTION7.1 - Control box30RA 040-08030RA 090-160Legend1 Main disconnect switchPE Earth

Page 7

167.2 - Power supplyThe power supply must conform to the specication on the chiller name plate. The supply voltage must be within the range specied

Page 8 - 3 - DIMENSIONS/CLEARANCES

178 - RECOMMENDED WIRE SECTIONSWire sizing is the responsibility of the installer, and depends on the characteristics and regulations applicable to ea

Page 9 - 30RA 200-240

189 - WATER CONNECTIONSFor size and position of the unit water inlet and outlet connec-tions refer to the certied dimensional drawings supplied with

Page 10 - 5 - ELECTRICAL DATA

199.3 - Frost protectionThe plate heat exchangers, the piping and the hydronic module pump can be damaged by frost, despite the built-in anti-freeze p

Page 11

20Installation components12 Air vent13 Thermometer sleeve14 Flexible connection15 Check valve16 System water drain plug (on connection pipe suppl

Page 12

3The drawings in this document are for illustrative purposes only and is not part of any offer for sale or contract.Contents1 - INTRODUCTION ...

Page 13

2110 - NOMINAL SYSTEM WATER FLOW CONTROLThe water circulation pumps of the 30RA units have been sized to allow the hydronic modules to cover all possi

Page 14 - 30RA 090-160

22When the circuit is cleaned, read the pressures at the pressure gauge (entering water pressure - leaving water pressure), expressed in bar and conve

Page 15

23Available static pressure, kPaWater ow rate, l/sAvailable static pressure, kPaWater ow rate, l/sLegend1 30RA 0402 30RA 0503 30RA 0604 30RA 070

Page 16

2411 - START-UP11.1 - Preliminary checks- Never be tempted to start the chiller without reading fully, and understanding, the operating instructions

Page 17

25Legend1 Saturated condensing temperature at the dew point2 Saturated liquid temperature at the bubble point3 Liquid refrigerant temperature4 Sat

Page 18 - B Water network

2612.2.2 - PrinciplesRefrigeration installations must be inspected and maintained regularly and rigorously by specialists. Their activities must be ov

Page 19 - Hydronic module

27R407C characteristicsBar Saturated bubble Saturated dew Bar Saturated bubble Saturated dew Bar Saturated bubble Saturated dew (relative)

Page 20

2813 - AQUASNAP MAINTENANCE PROGRAMMEAll maintenance operations must be carried out by technicians who have been trained on Carrier products, observin

Page 21

29Service CCarry out the operations listed under Service B.Refrigerant circuit- Check the leak-tightness of the circuit and ensure that there is no p

Page 22

3014 - START-UP CHECKLIST FOR 30RA LIQUID CHILLERS (USE FOR JOB FILE)Preliminary informationJob name: ...

Page 23

41 - INTRODUCTIONPrior to the initial start-up of the 30RA units, the people involved in the on-site installation, start-up, operation, and maintenanc

Page 24 - Pressure

31Unit start-up Chilled water pump starter has been properly interlocked with the chiller Oil level is correct Unit has been leak checked (including 

Page 25

Carry out the QUICK TEST function (see 30RA/RH - 30RY/RYH “B” Pro-Dialog Plus Control manual):Check and log on to the user menu congurationLoad seque

Page 26

51.4 - Repair safety considerationsAll installation parts must be maintained by the personnel in charge, in order to avoid material deterioration and

Page 27

6Avoid spilling liquid refrigerant on skin or splashing it into the eyes. Use safety goggles. Wash any spills from the skin with soap and water. If li

Page 28

72.2 - Moving and siting the unit2.2.1 - MovingSee chapter “Installation safety considerations”2.2.2 - Siting the unitAlways refer to the chapter “Dim

Page 29

8Checks before system start-upBefore the start-up of the refrigeration system, the complete installation, including the refrigeration system must be v

Page 30

930RA 090-1603 - DIMENSIONS/CLEARANCES30RA 040-080108113292071100010001212100010002071227813291000100010001000211112

Page 31

10Multiple chiller installationNOTE: If the walls are higher than 2 m, contact the factory.200010002000100020002000100010001000Solid surface Solid sur

Commentaires sur ces manuels

Pas de commentaire