Carrier operating and maintanance Instructions d'exploitation Page 8

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 41
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 7
8
4. LIFTING INSTRUCTIONS
4.1. General
There are transport and lifting instructions attached
to the AHU.
4.2. Lifting Bar Certification
The lifting bars supplied are for single use and certi-
fied in accordance with Machinery Directive 2006/42/
EC, annex II-A. Selection.
4.3. Fastening of the Lifting Bars
Remove the bolt and the locking plate on one side
of the lifting pipe.
Figure 5. Fastening the lifting bars - 1
Slide the lifting bar into the hole in the subframe
intended for that purpose.
3. PREPARATION for ASSEMBLY
The following material is supplied as standard by
Alarko Carrier:
Installation, maintenance and operating instruc-
tions
• Installation, operation and maintenance manual
• II A declaration
• Connecting parts
• Material list
The following material is supplied as an option by
Alarko Carrier:
Anti-vibration mats
• Outside air suction grille
• Heat recovery wheel control
• Steam generator and accessories
Check that all necessary parts are supplied with the
AHU.
Measure the location and make sure it is tidy. The
floor of the installation area should be level and flat
to avoid connection problems. Any uneven surfaces
should be evened out with infill plates.
Determine the correct assembly sequence of the
AHU sections. Use the most logical sequence, tak-
ing the location into account. Begin with the casing
section that must be positioned on the highest part
of the floor, so that the other casing sections can be
added around it.
Vue de la page 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 40 41

Commentaires sur ces manuels

Pas de commentaire