5. Open the filter clips which are located underneath the
hood top. Insert the aluminum filter into the bottom
filter rack (hood divider). Push the filter into position
past the open filter clips. Close the filter clips to lock
the filter into place. See Fig. 15.
DIVIDER
BAROMETRIC
RELIEF
CLEANABLE
ALUMINUM
FILTER
FILTER
HOOD
FILTER
CLIP
OUTSIDE
AIR
C08634
Fig. 15 -- Economizer Filter Installation
6. Caulk the ends of the joint between the unit top panel
and the hood top.
7. Replace the filter access panel.
Step 9 — Install External Condensate Trap and
Line
The unit has one 19 mm
(3
/
4
-in.) condensate drain
connection on the end of the condensate pan and an
alternate connection on the bottom. See Fig. 16. Unit
airflow configuration does not determine which drain
connection to use. Either drain connection can be used
with vertical or horizontal applications.
When using the standard side drain connection, ensure the
red plug in the alternate bottom connection is tight. Do
this before setting the unit in place. The red drain pan can
be tightened with a 12.7 mm
(1
/
2
--in.) square socket drive
extension.
To use the alternate bottom drain connection, remove the
red drain plug from the bottom connection (use a 12 mm
[1
/
2
--in.] square socket drive extension) and install it in the
side drain connection.
DRAIN
(FACTORY-INSTALLED)
PLUG
CONDENSATE PAN (SIDE VIEW)
STANDARD
SIDE DRAIN
ALTERNATE
BOTTOM DRAIN
C08021
Fig. 16 -- Condensate Drain Pan (Side View)
The piping for the condensate drain and external trap can
be completed after the unit is in place. See Fig. 17.
NOTE: Trap should be deep enough to offset maximum unit static
difference. A 102 mm (4 in.) trap is recommended
.
MINIMUM PITCH
25 mm (1 in.) PER
3m (10 ft.) OF LINE
BASE RAIL
OPEN
VENT
TO ROOF
DRAIN
DRAIN PLUG
ROOF
CURB
SEE NOTE
51 mm
(2 in.)
MIN
C09387
Fig. 17 -- Condensate Drain Piping Details
All units must have an external trap for condensate
drainage. Install a trap at least 102 mm (4-in.) deep and
protect against freeze-up. If drain line is installed
downstream from the external trap, pitch the line away
from the unit at 25 mm in 3 m (1-in. per 10 ft) of run. Do
not use a pipe size smaller than the unit connection of
19 mm (
3
/
4
-in.).
Step 10 Make Electrical Connections
ELECTRICAL SHOCK HAZARD
Failure to follow this warning could result in personal
injury or death.
Do not use gas piping as an electrical ground. Unit
cabinet must have an uninterrupted, unbroken
electrical ground to minimize the possibility of
personal injury if an electrical fault should occur. This
ground may consist of electrical wire connected to
unit ground lug in control compartment, or conduit
approved for electrical ground when installed in
accordance with local electrical codes or in absence
of local codes, it is recommended that the U.S.A.
standard ANSI/NFPA 70, National Electrical Code
(NEC), be followed.
!
WARNING
NOTE: Check all factory and field electrical connections
for tightness. Field--supplied wiring shall conform with
the limitations of 33_C(63_F) rise.
Field power wires are connected to the unit at line--side
pressure lugs on compressor contactor C and indoor fan
contactor IFC (see wiring diagram label for control box
component arrangement) or at factory--installed option
non--fused disconnect switch. Use copper conductors only.
NOTE: Make field power connections directly to line
connection pressure lugs only.
50TC